IS WORK OVER?

Automation index

How much of a Meteorologist’s job can AI already do?

A model and a map come earlier. Saying whether a village should evacuate does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Meteorologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Models, maps and a first forecast.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Observation, sondes and satellite.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Warnings, civil protection and media.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Shift, uncertainty and not over-scaring.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Verification, archives and research.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sitting on a warning that saves someone.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Models, maps and a first forecast
  • Observation, sondes and satellite
  • Warnings, civil protection and media
  • Shift, uncertainty and not over-scaring
  • Verification, archives and research
  • meteorologo

Sources for this job· O*NET 19-2021.00· ESCO/ISCO 2112

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 243Brewer25%
  2. 244Tool and die maker25%
  3. 245Auto mechanic25%
  4. 247Motion designer25%
  5. 248Education specialist25%
  6. 249Political scientist25%