IS WORK OVER?

Automation index

How much of a Metrology technician’s job can AI already do?

A CMM program comes earlier. A true dimension without dressing the report do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Metrology technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, CMM and the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Measure, the stylus and the one that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, GD&T and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Room, the temperature and the soak.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The shop, the rush and not leaving the part dirty.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
A true dimension, and a clean report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMM
  • GD&T
  • stylus
  • measurement programs
  • metrology room
  • dimensions
  • dimensional reports
  • soak

Sources for this job· O*NET 17-3028.00· ESCO/ISCO 3111

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 397Fibre technician22%
  2. 398Maintenance technician22%
  3. 399Environmental technician22%
  4. 401Waste technician22%
  5. 402Irrigation technician22%
  6. 403Semiconductor technician22%