Automation index
How much of a Metrology technician’s job can AI already do?
A CMM program comes earlier. A true dimension without dressing the report do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Metrology technician
22%
AI can already do 22% of this job.
#471 / 743
View rankingMetrology technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, CMM and the part.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Measure, the stylus and the one that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Report, GD&T and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Room, the temperature and the soak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The shop, the rush and not leaving the part dirty.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
A true dimension, and a clean report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMM
- GD&T
- stylus
- measurement programs
- metrology room
- dimensions
- dimensional reports
- soak
Sources for this job· O*NET 17-3028.00· ESCO/ISCO 3111
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142