IS WORK OVER?

Automation index

How much of a Metrology technician’s job can AI already do?

A CMM program comes earlier. A true dimension without dressing the report do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Metrology technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, CMM and the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Measure, the stylus and the one that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, GD&T and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Room, the temperature and the soak.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The shop, the rush and not leaving the part dirty.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
A true dimension, and a clean report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMM
  • GD&T
  • stylus
  • measurement programs
  • metrology room
  • dimensions
  • dimensional reports
  • soak

Sources for this job· O*NET 17-3028.00· ESCO/ISCO 3111

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 397Fibre technician22%
  2. 398Maintenance technician22%
  3. 399Environmental technician22%
  4. 401Waste technician22%
  5. 402Irrigation technician22%
  6. 403Semiconductor technician22%