Automation index
How much of a Microbiologist’s job can AI already do?
A protocol and a first result come earlier. A culture that does not contaminate does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Microbiologist
22%
AI can already do 22% of this job.
#411 / 733
View rankingMicrobiologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, plates and a first result.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plate, incubate and read cultures.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Report to the clinician and not jump.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, strains and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Biosafety, waste and kit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not calling a negative that is a positive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, plates and a first result
- Plate, incubate and read cultures
- Report to the clinician and not jump
- Quality, strains and documentation
- Biosafety, waste and kit
- Not calling a negative that is a positive
- microbiologo
Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142