Automation index
How much of a Miller’s job can AI already do?
A mill diagram comes earlier. Regular flour without scorching the grain do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Miller
22%
AI can already do 22% of this job.
#412 / 733
View rankingMiller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wheat, moisture and the diagram.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mill, sift and the one that heats.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Quality, ash and the baker who complains.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cleaning, pests and the silo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The harvest, the batch and not mixing the wet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Regular flour, and not scorching the grain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mill wheat
- sift
- grain moisture
- ash
- silos
- mill pests
- mill diagrams
- flour batches
Sources for this job· O*NET 51-9021.00· ESCO/ISCO 8160
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142