IS WORK OVER?

Automation index

How much of a Miller’s job can AI already do?

A mill diagram comes earlier. Regular flour without scorching the grain do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Miller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Wheat, moisture and the diagram.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Mill, sift and the one that heats.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Quality, ash and the baker who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cleaning, pests and the silo.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The harvest, the batch and not mixing the wet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Regular flour, and not scorching the grain.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mill wheat
  • sift
  • grain moisture
  • ash
  • silos
  • mill pests
  • mill diagrams
  • flour batches

Sources for this job· O*NET 51-9021.00· ESCO/ISCO 8160

Gas network engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, pressures and the diameter.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Trench, the weld and the one that was not x-rayed.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Leak, the detector and getting people out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cut, the bypass and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the rush and not covering without testing.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the trench does not go up, and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • network pressures
  • diameters
  • trenches
  • gas welds
  • leaks
  • detectors
  • bypass
  • x-rays

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 423Palliative care doctor22%
  2. 424Merchandiser22%
  3. 425Microbiologist22%
  4. 427Music therapist22%
  5. 428Notary22%
  6. 429Oceanographer22%