IS WORK OVER?

Automation index

How much of a Miller’s job can AI already do?

A mill diagram comes earlier. Regular flour without scorching the grain do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Miller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Wheat, moisture and the diagram.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Mill, sift and the one that heats.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Quality, ash and the baker who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cleaning, pests and the silo.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The harvest, the batch and not mixing the wet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Regular flour, and not scorching the grain.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mill wheat
  • sift
  • grain moisture
  • ash
  • silos
  • mill pests
  • mill diagrams
  • flour batches

Sources for this job· O*NET 51-9021.00· ESCO/ISCO 8160

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 352Gastroenterologist22%
  2. 353Merchandiser22%
  3. 354Microbiologist22%
  4. 356Notary22%
  5. 357Oceanographer22%
  6. 358Ophthalmologist22%