Automation index
How much of a Miller’s job can AI already do?
A mill diagram comes earlier. Regular flour without scorching the grain do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Miller
22%
AI can already do 22% of this job.
#436 / 763
View rankingMiller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wheat, moisture and the diagram.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mill, sift and the one that heats.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Quality, ash and the baker who complains.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cleaning, pests and the silo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The harvest, the batch and not mixing the wet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Regular flour, and not scorching the grain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mill wheat
- sift
- grain moisture
- ash
- silos
- mill pests
- mill diagrams
- flour batches
Sources for this job· O*NET 51-9021.00· ESCO/ISCO 8160
IS WORK OVER?
Requirements engineer
27%
#187 / 763
View rankingRequirements engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Workshop, the actor and the requirement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Conflict, the loudest and not swallowing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Criterion, the test and not leaving it vague.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the impact and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The project lead, the deadline and not cutting the one that matters.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is needed, and not the loudest one's.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- requirements
- actor workshops
- acceptance criteria
- change impact
- backlog
- tests
- not swallow the loudest
- ambiguity
Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511