IS WORK OVER?

Automation index

How much of a Miller’s job can AI already do?

A mill diagram comes earlier. Regular flour without scorching the grain do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Miller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Wheat, moisture and the diagram.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Mill, sift and the one that heats.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Quality, ash and the baker who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cleaning, pests and the silo.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The harvest, the batch and not mixing the wet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Regular flour, and not scorching the grain.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mill wheat
  • sift
  • grain moisture
  • ash
  • silos
  • mill pests
  • mill diagrams
  • flour batches

Sources for this job· O*NET 51-9021.00· ESCO/ISCO 8160

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 352Gastroenterologist22%
  2. 353Merchandiser22%
  3. 354Microbiologist22%
  4. 356Notary22%
  5. 357Oceanographer22%
  6. 358Ophthalmologist22%