IS WORK OVER?

Automation index

How much of a Milliner’s job can AI already do?

A block comes earlier. Sitting on the head without flying at the first breeze do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Milliner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Block, crown and the material.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Shape, stitch and the brim that will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fit, the hair and the one that will not take a pin.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Trim, feather and the balance.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wedding, the wind and not making a prop hat.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it sits, and does not fly.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hat blocks
  • crowns
  • brims
  • feathers
  • pins
  • fit hats
  • trim
  • balance

Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7531

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Analyse my job

Jobs with similar scores

  1. 651Maxillofacial prosthetist19%
  2. 652Furniture restorer19%
  3. 653Tailor19%
  4. 655Well driller19%
  5. 656Woodcarver19%
  6. 657Aerospace technician19%