Automation index
How much of a Milliner’s job can AI already do?
A block comes earlier. Sitting on the head without flying at the first breeze do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Milliner
19%
AI can already do 19% of this job.
#636 / 743
View rankingMilliner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Block, crown and the material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Shape, stitch and the brim that will not sit.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fit, the hair and the one that will not take a pin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Trim, feather and the balance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wedding, the wind and not making a prop hat.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it sits, and does not fly.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hat blocks
- crowns
- brims
- feathers
- pins
- fit hats
- trim
- balance
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7531
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142