IS WORK OVER?

Automation index

How much of a Milliner’s job can AI already do?

A block comes earlier. Sitting on the head without flying at the first breeze do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Milliner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Block, crown and the material.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Shape, stitch and the brim that will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fit, the hair and the one that will not take a pin.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Trim, feather and the balance.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wedding, the wind and not making a prop hat.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it sits, and does not fly.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hat blocks
  • crowns
  • brims
  • feathers
  • pins
  • fit hats
  • trim
  • balance

Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7531

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 540Dance teacher19%
  2. 541Furniture restorer19%
  3. 542Tailor19%
  4. 544Well driller19%
  5. 545Woodcarver19%
  6. 546Wind-turbine technician19%