Automation index
How much of a Milliner’s job can AI already do?
A block comes earlier. Sitting on the head without flying at the first breeze do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Milliner
19%
AI can already do 19% of this job.
#533 / 633
View rankingMilliner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Block, crown and the material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Shape, stitch and the brim that will not sit.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fit, the hair and the one that will not take a pin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Trim, feather and the balance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wedding, the wind and not making a prop hat.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it sits, and does not fly.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hat blocks
- crowns
- brims
- feathers
- pins
- fit hats
- trim
- balance
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7531
IS WORK OVER?
Mining engineer
22%
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146