IS WORK OVER?

Automation index

How much of a Milliner’s job can AI already do?

A block comes earlier. Sitting on the head without flying at the first breeze do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Milliner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Block, crown and the material.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Shape, stitch and the brim that will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fit, the hair and the one that will not take a pin.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Trim, feather and the balance.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wedding, the wind and not making a prop hat.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it sits, and does not fly.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hat blocks
  • crowns
  • brims
  • feathers
  • pins
  • fit hats
  • trim
  • balance

Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7531

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 540Dance teacher19%
  2. 541Furniture restorer19%
  3. 542Tailor19%
  4. 544Well driller19%
  5. 545Woodcarver19%
  6. 546Wind-turbine technician19%