Automation index
How much of a Milliner’s job can AI already do?
A block comes earlier. Sitting on the head without flying at the first breeze do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Milliner
19%
AI can already do 19% of this job.
#543 / 643
View rankingMilliner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Block, crown and the material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Shape, stitch and the brim that will not sit.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fit, the hair and the one that will not take a pin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Trim, feather and the balance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wedding, the wind and not making a prop hat.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it sits, and does not fly.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hat blocks
- crowns
- brims
- feathers
- pins
- fit hats
- trim
- balance
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7531
IS WORK OVER?
Renewables engineer
27%
#165 / 643
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149