Automation index
How much of a Miner’s job can AI already do?
A blast plan and a log come earlier. Going down, drilling, and coming out alive do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Miner
16%
AI can already do 16% of this job.
#616 / 643
View rankingMiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, blast plans and sensors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Logged maintenance and mine CMMS.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Drill, load and extract.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Support, ventilation and water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, gases and evacuation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Shift, partner and not getting casual.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, blast plans and sensors
- Logged maintenance and mine CMMS
- Drill, load and extract
- Support, ventilation and water
- Safety, gases and evacuation
- Shift, partner and not getting casual
- minero
- miner
- interior de mina
Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111
IS WORK OVER?
Civil engineer
25%
#236 / 643
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142