IS WORK OVER?

Automation index

How much of a Miner’s job can AI already do?

A blast plan and a log come earlier. Going down, drilling, and coming out alive do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Miner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, blast plans and sensors.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Logged maintenance and mine CMMS.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Drill, load and extract.
Estimate

No public source provides a precise figure. This is our estimate.

24%10%+2.4
Support, ventilation and water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, gases and evacuation.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Shift, partner and not getting casual.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, blast plans and sensors
  • Logged maintenance and mine CMMS
  • Drill, load and extract
  • Support, ventilation and water
  • Safety, gases and evacuation
  • Shift, partner and not getting casual
  • minero
  • miner
  • interior de mina

Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 733Formwork carpenter16%
  2. 734Stevedore16%
  3. 735Crane operator16%
  4. 737Scaffolder16%
  5. 738Baker16%
  6. 739Cleaner16%