IS WORK OVER?

Automation index

How much of a Miner’s job can AI already do?

A blast plan and a log come earlier. Going down, drilling, and coming out alive do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Miner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, blast plans and sensors.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Logged maintenance and mine CMMS.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Drill, load and extract.
Estimate

No public source provides a precise figure. This is our estimate.

24%10%+2.4
Support, ventilation and water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, gases and evacuation.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Shift, partner and not getting casual.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, blast plans and sensors
  • Logged maintenance and mine CMMS
  • Drill, load and extract
  • Support, ventilation and water
  • Safety, gases and evacuation
  • Shift, partner and not getting casual
  • minero
  • miner
  • interior de mina

Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111

Metro driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, tests and the cab log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stop at platforms and regulate running.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Incidents, evacuation and talk to Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetables, reliefs and the day’s orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Passengers, platforms and announcements.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Rules, fatigue and liability for the train.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive metro trains
  • stop at platforms
  • regulate running
  • evacuate tunnels
  • talk to control
  • cab checks
  • handle incidents
  • drive under ATO

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Analyse my job

Jobs with similar scores

  1. 613Formwork carpenter16%
  2. 614Stevedore16%
  3. 615Crane operator16%
  4. 617Scaffolder16%
  5. 618Baker16%
  6. 619Cleaner16%