Automation index
How much of a Miner’s job can AI already do?
A blast plan and a log come earlier. Going down, drilling, and coming out alive do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Miner
16%
AI can already do 16% of this job.
#716 / 743
View rankingMiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, blast plans and sensors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Logged maintenance and mine CMMS.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Drill, load and extract.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Support, ventilation and water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, gases and evacuation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Shift, partner and not getting casual.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, blast plans and sensors
- Logged maintenance and mine CMMS
- Drill, load and extract
- Support, ventilation and water
- Safety, gases and evacuation
- Shift, partner and not getting casual
- minero
- miner
- interior de mina
Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142