IS WORK OVER?

Automation index

How much of a Miner’s job can AI already do?

A blast plan and a log come earlier. Going down, drilling, and coming out alive do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Miner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, blast plans and sensors.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Logged maintenance and mine CMMS.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Drill, load and extract.
Estimate

No public source provides a precise figure. This is our estimate.

24%10%+2.4
Support, ventilation and water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, gases and evacuation.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Shift, partner and not getting casual.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, blast plans and sensors
  • Logged maintenance and mine CMMS
  • Drill, load and extract
  • Support, ventilation and water
  • Safety, gases and evacuation
  • Shift, partner and not getting casual
  • minero
  • miner
  • interior de mina

Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111

Research scientist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Literature review, figures and drafts.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Analysis, code and experiment boards.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Design the study and the controls.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Run the experiment or the fieldwork.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Lead a group, theses and authorship fights.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Win funding and answer reviewers.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Literature review, figures and drafts
  • Analysis, code and experiment boards
  • Design the study and the controls
  • Run the experiment or the fieldwork
  • Lead a group, theses and authorship fights
  • Win funding and answer reviewers
  • cientifico
  • investigador
  • research scientist

Sources for this job· O*NET 19-1029.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 613Formwork carpenter16%
  2. 614Stevedore16%
  3. 615Crane operator16%
  4. 617Scaffolder16%
  5. 618Baker16%
  6. 619Cleaner16%