IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

BI analyst

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model data, light ETL and dashboards.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Write SQL, measures and docs.
Estimate

No public source provides a precise figure. This is our estimate.

18%50%+9
Define KPIs with the business and negotiate meaning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Present insights and defend the number.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Data quality, alerts and lineage.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Prioritise requests and say no.
Estimate

No public source provides a precise figure. This is our estimate.

12%20%+2.4
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model data, light ETL and dashboards
  • Write SQL, measures and docs
  • Present insights and defend the number
  • Data quality, alerts and lineage
  • Prioritise requests and say no
  • business intelligence
  • analista bi
  • power bi
  • looker

Sources for this job· O*NET 15-2051.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 338Ice-cream maker22%
  2. 339Hydrologist22%
  3. 340Agronomist22%
  4. 342Forestry engineer22%
  5. 343EV charger installer22%
  6. 344Social integrator22%