IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Coast guard

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shout, the position and the boat.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sea, the one who is drowning and the storm.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Inspection, the trawler and the one that runs.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Night, the radar and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The station, the note and not dressing the shortfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the one who is drowning, and not losing the boat.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boats
  • shouts
  • drowning
  • trawlers
  • radar
  • the storm
  • inspections at sea
  • station notes

Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5411

Analyse my job

Jobs with similar scores

  1. 378Ice-cream maker22%
  2. 379Hydrologist22%
  3. 380Agronomist22%
  4. 382Forestry engineer22%
  5. 383Welding inspector22%
  6. 384EV charger installer22%