IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Commissioning engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, the loop and the punch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, start-up and the one that is not ready.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Test, the trip and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Vendors, the one who does not come and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Start up, and not leaving the interlock jumped.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test protocols
  • loops
  • punch list
  • start-up
  • trips
  • vendors
  • interlocks
  • not sign half done

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 382Hydrologist22%
  2. 383Agronomist22%
  3. 384Mechatronics engineer22%
  4. 386Bridge engineer22%
  5. 387Commissioning engineer22%
  6. 388Safety engineer22%