Automation index
How much of a Mining engineer’s job can AI already do?
A deposit model comes earlier. Going down and not leaving an unsafe face does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mining engineer
22%
AI can already do 22% of this job.
#390 / 743
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Cost engineer
27%
#173 / 743
View rankingCost engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, rates and the budget.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the variance and the one that was not logged.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Change, the extra and not giving it away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Close, the dispute and not inflating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Management, the bid and not selling the reckless one.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The real number, and not the reckless bid.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measures
- unit rates
- variances
- extras
- disputes
- reckless bids
- works budgets
- closes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142