IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Early childhood educator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan activities, reports and rubrics.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Write to families.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Care, play and hold the room.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Hygiene, meals and naps.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Watch development and talk to the family.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Coordinate staff and safeguarding.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan activities, reports and rubrics
  • Write to families
  • Care, play and hold the room
  • Hygiene, meals and naps
  • Watch development and talk to the family
  • Coordinate staff and safeguarding
  • educador infantil
  • maestro de infantil
  • preschool
  • jardin de infancia

Sources for this job· O*NET 25-2011.00· ESCO/ISCO 2342

Analyse my job

Jobs with similar scores

  1. 338Ice-cream maker22%
  2. 339Hydrologist22%
  3. 340Agronomist22%
  4. 342Forestry engineer22%
  5. 343EV charger installer22%
  6. 344Social integrator22%