IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Gas network engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, pressures and the diameter.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Trench, the weld and the one that was not x-rayed.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Leak, the detector and getting people out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cut, the bypass and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the rush and not covering without testing.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the trench does not go up, and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • network pressures
  • diameters
  • trenches
  • gas welds
  • leaks
  • detectors
  • bypass
  • x-rays

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 391Instrumentation engineer22%
  2. 392Facilities engineer22%
  3. 393Mechatronics engineer22%
  4. 395Bridge engineer22%
  5. 396Commissioning engineer22%
  6. 397Gas network engineer22%