IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

In-house counsel

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Contract, clauses and the risk.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Sales, the close and not yielding the essential.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Dispute, the procurator and not sleeping the deadline.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Board, the memo and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The CEO, the rush and not signing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Say no, and not leaving the company sold.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • commercial contracts
  • clauses
  • legal risk
  • the board
  • procedural deadlines
  • sales
  • not sign blind
  • legal memos

Sources for this job· O*NET 23-1011.00· ESCO/ISCO 2611

Analyse my job

Jobs with similar scores

  1. 371Ice-cream maker22%
  2. 372Hydrologist22%
  3. 373Agronomist22%
  4. 375Forestry engineer22%
  5. 376Welding inspector22%
  6. 377EV charger installer22%