IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Instructional designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Aim, the storyboard and the module.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pilot, the learner and what is not understood.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Activity, the feedback and not putting a silly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
LMS, the figure and not inflating completion.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the deadline and not cutting the practice.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That they learn, and not leaving the empty video.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • course storyboard
  • modules
  • learner pilot
  • activities
  • LMS
  • completion
  • feedback
  • not a silly test

Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351

Analyse my job

Jobs with similar scores

  1. 371Ice-cream maker22%
  2. 372Hydrologist22%
  3. 373Agronomist22%
  4. 375Forestry engineer22%
  5. 376Welding inspector22%
  6. 377EV charger installer22%