Automation index
How much of a Mining engineer’s job can AI already do?
A deposit model comes earlier. Going down and not leaving an unsafe face does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mining engineer
22%
AI can already do 22% of this job.
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Panel beater
18%
#559 / 633
View rankingPanel beater
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess, order parts and quote.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pull, weld and set gaps.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Fill, sand and prep for paint.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Client, insurer and deadlines.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shop, benches and tools.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Not delivering a car that looks bent.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Assess, order parts and quote
- Pull, weld and set gaps
- Fill, sand and prep for paint
- Client, insurer and deadlines
- Shop, benches and tools
- Not delivering a car that looks bent
- chapista
- panel beater
- chapa y pintura
Sources for this job· O*NET 49-3021.00· ESCO/ISCO 7213