Automation index
How much of a Mining engineer’s job can AI already do?
A deposit model comes earlier. Going down and not leaving an unsafe face does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mining engineer
22%
AI can already do 22% of this job.
#347 / 643
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Pharmacovigilance officer
27%
#186 / 643
View rankingPharmacovigilance officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Case, the file and MedDRA.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Seriousness, the link and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
File, the AEMPS deadline and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Signal, the aggregate and not playing it down.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The doctor, the ADR and not arguing the story.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
If it is serious, call it. And not staying quiet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- ADR
- MedDRA
- AEMPS
- safety signals
- seriousness
- causality
- case files
- regulatory deadlines
Sources for this job· O*NET 29-1051.00· ESCO/ISCO 2262