IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Physicist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Simulate, fit and reduce data.
Estimate

No public source provides a precise figure. This is our estimate.

22%50%+11
Draft papers, posters and proposals.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Design the experiment and the apparatus.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Measure in the lab or in the field.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Argue with the group and peer-review.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Win machine time and funding.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Simulate, fit and reduce data
  • Draft papers, posters and proposals
  • Design the experiment and the apparatus
  • Measure in the lab or in the field
  • Argue with the group and peer-review
  • Win machine time and funding
  • fisico
  • physicist

Sources for this job· O*NET 19-2012.00· ESCO/ISCO 2111

Analyse my job

Jobs with similar scores

  1. 338Ice-cream maker22%
  2. 339Hydrologist22%
  3. 340Agronomist22%
  4. 342Forestry engineer22%
  5. 343EV charger installer22%
  6. 344Social integrator22%