Automation index
How much of a Mining engineer’s job can AI already do?
A deposit model comes earlier. Going down and not leaving an unsafe face does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mining engineer
22%
AI can already do 22% of this job.
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Production engineer
25%
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141