IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Public health officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Surveillance, the indicator and the alert.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Outbreak, the questionnaire and the one who will not answer.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Field, the source and shutting the premises.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the mayor and not softening the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vaccination, coverage and the rumour.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Cut the outbreak, and not softening it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • epi surveillance
  • outbreaks
  • field questionnaires
  • shut premises
  • vaccine coverage
  • public-health alerts
  • mayors
  • not soften figures

Sources for this job· O*NET 21-1091.00· ESCO/ISCO 2263

Analyse my job

Jobs with similar scores

  1. 350Ice-cream maker22%
  2. 351Hydrologist22%
  3. 352Agronomist22%
  4. 354Forestry engineer22%
  5. 355Welding inspector22%
  6. 356EV charger installer22%