Automation index
How much of a Mining engineer’s job can AI already do?
A deposit model comes earlier. Going down and not leaving an unsafe face does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mining engineer
22%
AI can already do 22% of this job.
#394 / 753
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Requirements engineer
27%
#181 / 753
View rankingRequirements engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Workshop, the actor and the requirement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Conflict, the loudest and not swallowing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Criterion, the test and not leaving it vague.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the impact and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The project lead, the deadline and not cutting the one that matters.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is needed, and not the loudest one's.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- requirements
- actor workshops
- acceptance criteria
- change impact
- backlog
- tests
- not swallow the loudest
- ambiguity
Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511