IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Small-hydro technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, set-point and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Turbine, the bearing and the one that sounds.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Gate, the jam and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Low flow, the river and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The flood, the spill and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it spins, and not dry.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turbinable flow
  • bearings
  • gates
  • low flow
  • spills
  • small hydro
  • turbine logs
  • jams

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 344Ice-cream maker22%
  2. 345Hydrologist22%
  3. 346Agronomist22%
  4. 348Forestry engineer22%
  5. 349Welding inspector22%
  6. 350EV charger installer22%