IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Analyse my job

Jobs with similar scores

  1. 338Ice-cream maker22%
  2. 339Hydrologist22%
  3. 340Agronomist22%
  4. 342Forestry engineer22%
  5. 343EV charger installer22%
  6. 344Social integrator22%