IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Wall tiler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and the tile format.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Adhesive, set and the tray fall.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cut, drill and the tile that splits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grout, seal and the bath junction.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the model change and the stock that is late.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No ugly cut, and no leak.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tile walls
  • set out joints
  • bed tiles
  • tray fall
  • seal junctions
  • cut tiles
  • drill tile
  • grout

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122

Analyse my job

Jobs with similar scores

  1. 338Ice-cream maker22%
  2. 339Hydrologist22%
  3. 340Agronomist22%
  4. 342Forestry engineer22%
  5. 343EV charger installer22%
  6. 344Social integrator22%