IS WORK OVER?

Automation index

How much of a Mining engineer’s job can AI already do?

A deposit model comes earlier. Going down and not leaving an unsafe face does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Zoologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Census, marks and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the sign and the one that does not show.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Data, the model and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the works and the corridor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The storm, the nest and not getting close.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Follow, and not disturbing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • censuses
  • signs
  • marks
  • corridors
  • nests
  • field protocols
  • population models
  • works

Sources for this job· O*NET 19-1023.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 338Ice-cream maker22%
  2. 339Hydrologist22%
  3. 340Agronomist22%
  4. 342Forestry engineer22%
  5. 343EV charger installer22%
  6. 344Social integrator22%