IS WORK OVER?

Automation index

How much of a Mixer-truck driver’s job can AI already do?

A route and a slump come earlier. Arriving fresh and pouring without blocking the pump do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mixer-truck driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Order, mix and mixing time.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Drive, site and the tight access.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Pour, pump and the one who wants more water.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Wash, leftovers and not leaving a hard drum.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The jam, the delay and the concrete that sets.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Arrive fresh, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive mixers
  • batch
  • pour concrete
  • wash the drum
  • slump
  • concrete pump
  • mix order
  • site access

Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332

Materials engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tests, metallography and the spec.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shop, heat treatment and the part that fails spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material choice, corrosion and fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, certificates and the doubtful batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The field failure and the root cause.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not fail, and not swapping the material blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • materials tests
  • metallography
  • choose alloys
  • corrosion
  • fatigue
  • heat treatment
  • failure analysis
  • batch certificates

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 409Pork butcher21%
  2. 410Maxillofacial surgeon21%
  3. 411Composer21%
  4. 413Animal breeder21%
  5. 414Youth educator21%
  6. 415Prison educator21%