Automation index
How much of a Mixer-truck driver’s job can AI already do?
A route and a slump come earlier. Arriving fresh and pouring without blocking the pump do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mixer-truck driver
21%
AI can already do 21% of this job.
#412 / 633
View rankingMixer-truck driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Order, mix and mixing time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Drive, site and the tight access.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pour, pump and the one who wants more water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Wash, leftovers and not leaving a hard drum.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The jam, the delay and the concrete that sets.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Arrive fresh, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive mixers
- batch
- pour concrete
- wash the drum
- slump
- concrete pump
- mix order
- site access
Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332
IS WORK OVER?
Order picker
22%
#364 / 633
View rankingOrder picker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
List, location and the scan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Aisle, height and the parcel that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Errors, the short and calling it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Pace, the shift and the pallet that goes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Peaks, Black Friday and not mixing orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Hit the SKU, and not leaving a lame pallet.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- picking
- scan locations
- shorts
- build pallets
- warehouse aisles
- order peaks
- SKUs
- voice picking
Sources for this job· O*NET 53-7062.00· ESCO/ISCO 4321