Automation index
How much of a Mixer-truck driver’s job can AI already do?
A route and a slump come earlier. Arriving fresh and pouring without blocking the pump do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mixer-truck driver
21%
AI can already do 21% of this job.
#412 / 633
View rankingMixer-truck driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Order, mix and mixing time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Drive, site and the tight access.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pour, pump and the one who wants more water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Wash, leftovers and not leaving a hard drum.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The jam, the delay and the concrete that sets.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Arrive fresh, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive mixers
- batch
- pour concrete
- wash the drum
- slump
- concrete pump
- mix order
- site access
Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332
IS WORK OVER?
Power-plant operator
19%
#517 / 633
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131