Automation index
How much of a Mixer-truck driver’s job can AI already do?
A route and a slump come earlier. Arriving fresh and pouring without blocking the pump do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mixer-truck driver
21%
AI can already do 21% of this job.
#421 / 643
View rankingMixer-truck driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Order, mix and mixing time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Drive, site and the tight access.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pour, pump and the one who wants more water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Wash, leftovers and not leaving a hard drum.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The jam, the delay and the concrete that sets.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Arrive fresh, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive mixers
- batch
- pour concrete
- wash the drum
- slump
- concrete pump
- mix order
- site access
Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332
IS WORK OVER?
Renewables engineer
27%
#165 / 643
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149