Automation index
How much of a Mixer-truck driver’s job can AI already do?
A route and a slump come earlier. Arriving fresh and pouring without blocking the pump do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mixer-truck driver
21%
AI can already do 21% of this job.
#421 / 643
View rankingMixer-truck driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Order, mix and mixing time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Drive, site and the tight access.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pour, pump and the one who wants more water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Wash, leftovers and not leaving a hard drum.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The jam, the delay and the concrete that sets.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Arrive fresh, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive mixers
- batch
- pour concrete
- wash the drum
- slump
- concrete pump
- mix order
- site access
Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332
IS WORK OVER?
Seismologist
27%
#182 / 643
View rankingSeismologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Network, catalogue and the location.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Quake, the analysis and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Alert, civil protection and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Field, the station and the one that dies.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The press, the rumour and not scaring.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Locate, and not over-alarming.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- quake catalogues
- locate quakes
- seismic network
- alerts
- civil protection
- stations
- rumours
- quake analysis
Sources for this job· O*NET 19-2042.00· ESCO/ISCO 2114