IS WORK OVER?

Automation index

How much of a Mixer-truck driver’s job can AI already do?

A route and a slump come earlier. Arriving fresh and pouring without blocking the pump do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mixer-truck driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Order, mix and mixing time.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Drive, site and the tight access.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Pour, pump and the one who wants more water.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Wash, leftovers and not leaving a hard drum.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The jam, the delay and the concrete that sets.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Arrive fresh, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive mixers
  • batch
  • pour concrete
  • wash the drum
  • slump
  • concrete pump
  • mix order
  • site access

Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332

Small-hydro technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, set-point and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Turbine, the bearing and the one that sounds.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Gate, the jam and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Low flow, the river and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The flood, the spill and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it spins, and not dry.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turbinable flow
  • bearings
  • gates
  • low flow
  • spills
  • small hydro
  • turbine logs
  • jams

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 418Pork butcher21%
  2. 419Maxillofacial surgeon21%
  3. 420Composer21%
  4. 422Animal breeder21%
  5. 423Youth educator21%
  6. 424Prison educator21%