IS WORK OVER?

Automation index

How much of a ML engineer’s job can AI already do?

Training a baseline and a notebook is fast. Shipping it, watching drift, and owning the miss is not.

This percentage does not predict how many people will lose their jobs.

Task comparison

ML engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Train models, features and notebooks.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Evaluate, document and compare runs.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Deploy, monitor and retrain.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to product about what a good error is.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Dirty data, bias and model limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
On-call, incidents and rollback.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%29%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Train models, features and notebooks
  • Evaluate, document and compare runs
  • Deploy, monitor and retrain
  • Talk to product about what a good error is
  • Dirty data, bias and model limits
  • On-call, incidents and rollback
  • machine learning engineer
  • ingeniero ml
  • mlops

Sources for this job· O*NET 15-1221.00· ESCO/ISCO 2511

BIM modeller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, families and clash detection.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
IFC, BEP and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site, the one who will not open the model, and the meeting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quantities, parameters and the 4D nobody uses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The last-minute change and not breaking the federated model.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be built, and not over-modelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BIM modelling
  • clash detection
  • Revit families
  • IFC
  • BEP
  • coordinate trades
  • BIM quantities
  • federated model

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 61Court case manager29%
  2. 62Labour consultant29%
  3. 63Quality engineer29%
  4. 65Occupational physician29%
  5. 66Career counsellor29%
  6. 67Construction laborer29%