Automation index
How much of a ML engineer’s job can AI already do?
Training a baseline and a notebook is fast. Shipping it, watching drift, and owning the miss is not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
ML engineer
29%
AI can already do 29% of this job.
#64 / 623
View rankingML engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Train models, features and notebooks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Evaluate, document and compare runs.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 42% | +7.6 |
Deploy, monitor and retrain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to product about what a good error is.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Dirty data, bias and model limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
On-call, incidents and rollback.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Train models, features and notebooks
- Evaluate, document and compare runs
- Deploy, monitor and retrain
- Talk to product about what a good error is
- Dirty data, bias and model limits
- On-call, incidents and rollback
- machine learning engineer
- ingeniero ml
- mlops
Sources for this job· O*NET 15-1221.00· ESCO/ISCO 2511
IS WORK OVER?
Naval architect
25%
#240 / 623
View rankingNaval architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stability, strength and hull forms.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, specs and class rules.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Yard, sea trials and owner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Systems, machinery and onboard safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, IMO and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a hull that will not break.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Stability, strength and hull forms
- Drawings, specs and class rules
- Yard, sea trials and owner
- Systems, machinery and onboard safety
- Rules, IMO and documentation
- Sign a hull that will not break
- ingeniero naval
Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144