Automation index
How much of a ML engineer’s job can AI already do?
Training a baseline and a notebook is fast. Shipping it, watching drift, and owning the miss is not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
ML engineer
29%
AI can already do 29% of this job.
#64 / 623
View rankingML engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Train models, features and notebooks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Evaluate, document and compare runs.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 42% | +7.6 |
Deploy, monitor and retrain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to product about what a good error is.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Dirty data, bias and model limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
On-call, incidents and rollback.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Train models, features and notebooks
- Evaluate, document and compare runs
- Deploy, monitor and retrain
- Talk to product about what a good error is
- Dirty data, bias and model limits
- On-call, incidents and rollback
- machine learning engineer
- ingeniero ml
- mlops
Sources for this job· O*NET 15-1221.00· ESCO/ISCO 2511
IS WORK OVER?
Window installer
19%
#497 / 623
View rankingWindow installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure openings, subframe and the order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set, plumb and the missing packer.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Foam, seal and the sweating lintel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fittings, adjust and the sash that rubs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The lived-in house and not leaving the room freezing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it closes, and not trapping the lintel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measure openings
- subframes
- plumb windows
- seal lintels
- adjust sashes
- foam
- packers
- window fittings
Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125