Automation index
How much of a Montessori teacher’s job can AI already do?
A prepared environment comes earlier. Not interrupting the child who is actually working do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Montessori teacher
22%
AI can already do 22% of this job.
#419 / 753
View rankingMontessori teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Environment, the material and the order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Presentation, the tray and not doing it for them.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Observe, the note and not interrupting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Conflict, the boundary and not lecturing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The family, the wait and not selling magic.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not interrupting the one who is working.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- prepared environment
- Montessori material
- presentations
- observation
- trays
- not interrupt
- not lecture
- classroom order
Sources for this job· O*NET 25-2011.00· ESCO/ISCO 2342
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115