IS WORK OVER?

Automation index

How much of a Mosaicist’s job can AI already do?

A cartoon comes earlier. Setting tesserae so the image reads do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mosaicist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cartoon, cut and the colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set, joint and the one that goes off level.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Grout, clean and the sheen.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Floor, wall and the traffic.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the drawing and not changing halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it reads, and not leaving a trip.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tesserae
  • cartoon
  • grout
  • set mosaic
  • trip
  • walls
  • floors
  • cut the piece

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7112

BIM modeller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, families and clash detection.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
IFC, BEP and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site, the one who will not open the model, and the meeting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quantities, parameters and the 4D nobody uses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The last-minute change and not breaking the federated model.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be built, and not over-modelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BIM modelling
  • clash detection
  • Revit families
  • IFC
  • BEP
  • coordinate trades
  • BIM quantities
  • federated model

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 522Ski instructor19%
  2. 523Furniture assembler19%
  3. 524Plasterboard fitter19%
  4. 526Neurosurgeon19%
  5. 527Power-plant operator19%
  6. 528Demolition worker19%